World Journal of Engineering Research and Technology (WJERT) has indexed with various reputed international bodies like : Google Scholar , Index Copernicus , Indian Science Publications , SOCOLAR, China , International Institute of Organized Research (I2OR) , Cosmos Impact Factor , Research Bible, Fuchu, Tokyo. JAPAN , Scientific Indexing Services (SIS) , Jour Informatics (Under Process) , UDLedge Science Citation Index , International Impact Factor Services , International Scientific Indexing, UAE , International Society for Research Activity (ISRA) Journal Impact Factor (JIF) , International Innovative Journal Impact Factor (IIJIF) , Science Library Index, Dubai, United Arab Emirates , Scientific Journal Impact Factor (SJIF) , Science Library Index, Dubai, United Arab Emirates , Eurasian Scientific Journal Index (ESJI) , Global Impact Factor (0.342) , IFSIJ Measure of Journal Quality , Web of Science Group (Under Process) , Directory of Research Journals Indexing , Scholar Article Journal Index (SAJI) , International Scientific Indexing ( ISI ) , Scope Database , Academia , 

World Journal of Engineering Research and Technology

( An ISO 9001:2015 Certified International Journal )

An International Peer Reviewed Journal for Engineering Research and Technology

An Official Publication of Society for Advance Healthcare Research (Reg. No. : 01/01/01/31674/16)

ISSN 2454-695X

Impact Factor : 7.029

ICV : 79.45

News & Updation

  • Article Invited for Publication

    Article are invited for publication in WJERT Coming Issue

  • ICV

    WJERT Rank with Index Copernicus Value 79.45 due to high reputation at International Level

  • New Issue Published

    Its Our pleasure to inform you that, WJERT April 2024 Issue has been Published, Kindly check it on https://www.wjert.org/home/current_issues

  • WJERT: APRIL ISSUE PUBLISHED

    APRIL 2024 Issue has been successfully launched on 1 APRIL 2024.

  • WJERT New Impact Factor

    WJERT Impact Factor has been Increased to 7.029 for Year 2024.

Indexing

Abstract

OFF-GRID SOLLAR POWER SYSTEM DESIGN FOR THE OFFICE OF OIL PALM PLANTATION COMPANY (PT.X) IN WEST KALIMANTAN PROVINCE

Gilang Ardi Pratama and Isdaryanto Iskandar

ABSTRACT

The national solar power potential is equivalent to 207,898 MW, but only 0.05% or 100 MW has been utilized.Energy sources from the sun are one of the alternative choices because of their abundant availability and lower levels of pollution than fossil fuel power plant. This is what makes photovoltaic system technology one of the most popular renewable energy technologies in the world In this study, electric energy needs for PT X was determined to be 2162 watt-hour, with 2 units of AC ? pk, 2 units of LED television, 2 units of refrigerator, 2 units of washing machine, 1 unit of rice cooker, 8 units of lamp, and 5 units of computer. So, the total estimated electricity need for PT X is 13,000Wh/day. For solar panel plan requirement, the results of the analysis with the capability of 200 wp/panel showed a total need of 16 pieces with the arrangement of 3 on the x and y axes being 6, with a total voltage obtained being 105 volts and the total output current being 30 amperes with a total power of 3133 WP. The demand charge controller needed is 3 amperes and the inverter capacity is 3937 watts. For power storage, the required battery capacity is 4025 Ah, so it takes 4 batteries with a capacity of 2 volts 1000 ampere hours. Based on the simulation results that have been carried out, the estimated total electrical energy that can be generated for one year by off-grid Solar Power System is 13 KWh/day. This Design is able to meet the needs of the branch office electricity load of 95.85%.

[Full Text Article] [Download Certificate]