World Journal of Engineering Research and Technology (WJERT) has indexed with various reputed international bodies like : Google Scholar , Index Copernicus , Indian Science Publications , SOCOLAR, China , International Institute of Organized Research (I2OR) , Cosmos Impact Factor , Research Bible, Fuchu, Tokyo. JAPAN , Scientific Indexing Services (SIS) , Jour Informatics (Under Process) , UDLedge Science Citation Index , International Impact Factor Services , International Scientific Indexing, UAE , International Society for Research Activity (ISRA) Journal Impact Factor (JIF) , International Innovative Journal Impact Factor (IIJIF) , Science Library Index, Dubai, United Arab Emirates , Scientific Journal Impact Factor (SJIF) , Science Library Index, Dubai, United Arab Emirates , Eurasian Scientific Journal Index (ESJI) , Global Impact Factor (0.342) , IFSIJ Measure of Journal Quality , Web of Science Group (Under Process) , Directory of Research Journals Indexing , Scholar Article Journal Index (SAJI) , International Scientific Indexing ( ISI ) , Scope Database , Academia , 

World Journal of Engineering Research and Technology

( An ISO 9001:2015 Certified International Journal )

An International Peer Reviewed Journal for Engineering Research and Technology

An Official Publication of Society for Advance Healthcare Research (Reg. No. : 01/01/01/31674/16)

ISSN 2454-695X

Impact Factor : 7.029

ICV : 79.45

News & Updation

  • Article Invited for Publication

    Article are invited for publication in WJERT Coming Issue

  • ICV

    WJERT Rank with Index Copernicus Value 79.45 due to high reputation at International Level

  • New Issue Published

    Its Our pleasure to inform you that, WJERT April 2024 Issue has been Published, Kindly check it on https://www.wjert.org/home/current_issues

  • WJERT: APRIL ISSUE PUBLISHED

    APRIL 2024 Issue has been successfully launched on 1 APRIL 2024.

  • WJERT New Impact Factor

    WJERT Impact Factor has been Increased to 7.029 for Year 2024.

Indexing

Abstract

DEVELOPMENT OF INDICATORS FOR ESTIMATING THE COST OF WAREHOUSE BUILDINGS PROJECTS

Shaymaa Mahmood Badr*

ABSTRACT

The initial cost projections for any proposed project are an important pillar in determining the necessary budget to finance the project. The preliminary cost estimate requires that the surveyor have experience in project implementation. In addition to previous data on similar projects implemented and documented in a way that can be used in the formulation of initial cost estimates, and the lack of such data in the Iraqi contractors to the weakness of the available expertise, which is limited to the establishment of some small industrial workshops and buildings. The study deals with the study and analysis of a sample consisting of (50) storehouses during the period from( 2003 with different specifications and sizes, as well as the reasons for differences in the cost of building implementation - 1994) The warehouse buildings were carried out before and after the implementation year of the establishment. The storage buildings were classified according to their size. According to selections proposed by the researcher based on available data and on-site surveys of some buildings storehouse.