World Journal of Engineering Research and Technology (WJERT) has indexed with various reputed international bodies like : Google Scholar , Index Copernicus , Indian Science Publications , SOCOLAR, China , International Institute of Organized Research (I2OR) , Cosmos Impact Factor , Research Bible, Fuchu, Tokyo. JAPAN , Scientific Indexing Services (SIS) , Jour Informatics (Under Process) , UDLedge Science Citation Index , International Impact Factor Services , International Scientific Indexing, UAE , International Society for Research Activity (ISRA) Journal Impact Factor (JIF) , International Innovative Journal Impact Factor (IIJIF) , Science Library Index, Dubai, United Arab Emirates , Scientific Journal Impact Factor (SJIF) , Science Library Index, Dubai, United Arab Emirates , Eurasian Scientific Journal Index (ESJI) , Global Impact Factor (0.342) , IFSIJ Measure of Journal Quality , Web of Science Group (Under Process) , Directory of Research Journals Indexing , Scholar Article Journal Index (SAJI) , International Scientific Indexing ( ISI ) , Scope Database , Academia , 

World Journal of Engineering Research and Technology

( An ISO 9001:2015 Certified International Journal )

An International Peer Reviewed Journal for Engineering Research and Technology

An Official Publication of Society for Advance Healthcare Research (Reg. No. : 01/01/01/31674/16)

ISSN 2454-695X

Impact Factor : 7.029

ICV : 79.45

News & Updation

  • Article Invited for Publication

    Article are invited for publication in WJERT Coming Issue

  • ICV

    WJERT Rank with Index Copernicus Value 79.45 due to high reputation at International Level

  • New Issue Published

    Its Our pleasure to inform you that, WJERT April 2024 Issue has been Published, Kindly check it on https://www.wjert.org/home/current_issues

  • WJERT: APRIL ISSUE PUBLISHED

    APRIL 2024 Issue has been successfully launched on 1 APRIL 2024.

  • WJERT New Impact Factor

    WJERT Impact Factor has been Increased to 7.029 for Year 2024.

Indexing

Abstract

PROJECT PLANNING USING HEURISTICS APPROACH: A CASE STUDY OF GAP INTERNATIONAL LIMITED

*Elijah P. T. and Etebu O. M. O.

ABSTRACT

The sequence of activities from the beginning of a project to its completion is essentially the same, whether it?s a small two or three-day project or a large project that spans for several months. These activities are grouped into four different phase which are the initiation phase, planning phase, execution phase, and the close out or termination phase. This research work focused on both the planning and execution phases. The research was aimed at providing a suitable project planning and scheduling advisory system. The critical path method (CPM) was employed in achieving it. Network diagram for the reconstruction was developed and the models for the activities were also obtained and then the Excel program was used to simulate the models to give results for critical paths, shortest project duration, and project completion date.

[Full Text Article] [Download Certificate]