World Journal of Engineering Research and Technology (WJERT) has indexed with various reputed international bodies like : Google Scholar , Index Copernicus , Indian Science Publications , SOCOLAR, China , International Institute of Organized Research (I2OR) , Cosmos Impact Factor , Research Bible, Fuchu, Tokyo. JAPAN , Scientific Indexing Services (SIS) , Jour Informatics (Under Process) , UDLedge Science Citation Index , International Impact Factor Services , International Scientific Indexing, UAE , International Society for Research Activity (ISRA) Journal Impact Factor (JIF) , International Innovative Journal Impact Factor (IIJIF) , Science Library Index, Dubai, United Arab Emirates , Scientific Journal Impact Factor (SJIF) , Science Library Index, Dubai, United Arab Emirates , Eurasian Scientific Journal Index (ESJI) , Global Impact Factor (0.342) , IFSIJ Measure of Journal Quality , Web of Science Group (Under Process) , Directory of Research Journals Indexing , Scholar Article Journal Index (SAJI) , International Scientific Indexing ( ISI ) , Scope Database , Academia , 

World Journal of Engineering Research and Technology

( An ISO 9001:2015 Certified International Journal )

An International Peer Reviewed Journal for Engineering Research and Technology

An Official Publication of Society for Advance Healthcare Research (Reg. No. : 01/01/01/31674/16)

ISSN 2454-695X

Impact Factor : 7.029

ICV : 79.45

News & Updation

  • Article Invited for Publication

    Article are invited for publication in WJERT Coming Issue

  • ICV

    WJERT Rank with Index Copernicus Value 79.45 due to high reputation at International Level

  • New Issue Published

    Its Our pleasure to inform you that, WJERT April 2024 Issue has been Published, Kindly check it on https://www.wjert.org/home/current_issues

  • WJERT: APRIL ISSUE PUBLISHED

    APRIL 2024 Issue has been successfully launched on 1 APRIL 2024.

  • WJERT New Impact Factor

    WJERT Impact Factor has been Increased to 7.029 for Year 2024.

Indexing

Abstract

MODEL OF KNOWLEDGE-INTENSIVE PROCESS FOR ESTIMATION OF COST OF PRISON WORKS IN BRAZIL

Jamil José Salim Neto*, Camila Isaton, Antônio Edésio Jungles and Edimeia Liliani Schnitzler

ABSTRACT

The research has as its product the modeling of the intensive process of knowledge of the parametric estimation, called expedite (fast) and parametric (because it uses the parameters of the project and/or work) to be used to model the costs of services (foundations, superstructure, cladding, facilities, etc.) of undertakings for the purpose of incarceration: prisons, prisons, prisons, juvenile prisons and jails. The research aims to provide the model of the estimation process with recommendations for cost professionals to build their estimates. For the execution of this model, the samples came from 39 enterprises for use as juvenile prisons in a Brazilian state. The logic of the estimation process model can be reproduced for the other kinds of prisons mentioned above. The parametric estimation requires a multidisciplinary team; and there is a risk of not representing in the equations the real cost of services, when not all variables that influence costs are considered. Choosing the drivers proves to be one of the most delicate steps of the estimation.

[Full Text Article] [Download Certificate]